Project Cases
Small Factory Cabinet ESS Continuity
Source: Longlight Energy Published: 2026-07-14 Views: 249

Project Overview
Process lines that cannot tolerate stoppages use cabinet LiFePO4 energy storage as a bridge power source, with hybrid/off-grid inverters handling pure sine conversion.
Customer Challenge
Grid quality issues caused PLC resets and scrap. Diesel gensets were expensive to run for short interruptions and required manual start procedures.
Longlight Solution
Install Longlight-304 18kWh cabinet ESS with Longlight-INV6 (or Longlight-205 off-grid for pure islanding zones). Automatic transfer keeps PLCs, conveyors and quality sensors alive while larger non-critical loads may still wait for generator.
System Architecture
- Critical process bus fed by hybrid/off-grid inverter
- Longlight-304 cabinet ESS as energy buffer
- Optional PV to recharge storage and cut daytime demand
- Facility SCADA / App SOC visibility
Key Products Deployed



Technical Highlights
- Floor-standing cabinet form factor for plant rooms
- Smart BMS multi-protection suite
- Bluetooth / App SOC monitoring
- Pairs with both hybrid and off-grid inverter families
System Snapshot
| Battery | Longlight-304 18kWh LiFePO4 |
|---|---|
| Inverter options | Longlight-INV6 / Longlight-205 |
| Primary goal | Process continuity + peak shaving |
Results & Benefits
- Reduced unplanned downtime on critical lines
- Lower diesel runtime for short outages
- Measurable evening peak reduction
Related Equipment

Longlight-304

Longlight-INV6

Longlight-205
Need a similar PV + energy storage design for your market? Longlight Energy supports OEM/ODM, multi-unit parallel schemes and global distribution partners.
Reference solution based on Longlight Energy product portfolio — Solar Inverter & Battery Energy Storage Power Supply.